Installation of a new storm water treatment vault and upgrade the existing containment system to treat and store oil in the event of a spill.
This project was comprised of storm water, sewer, water, gas, building footings and parkinglot upgrades.
Design and construct a pipeline that discharges treated leachate generated at the CERCLA landfill into the City of the Dalles sanitary sewer collection and treatment system.
Installation ofl a vehicle wash rack system at the BPA Alvey Maintenance Facility.
Upgrade the storm water treatment and containment system; constructing two onsite filteration basins. Includes erosion and sediment control system.
Construct a large industrial truck wash rack at the BPA Chemawa Substation Facility. The equipment wash rack is a recirculated system with zero discharge.
Installation of a new stormwater treatement system and upgrade the recycling facilities existing operating platform.
Installation of a secondary containment/stormwater treatement system for oil filled equipment at the Albany Substation.
Installation of new secondary containment system to bring the facility into compliance with regulatory requirements.