Tricter Rig
  • Home
  • Contact Us
  • Satisfied Clients
  • Selected Projects
  • SAFETY
  • PROJECT DETAIL
  • TESTIMONIALS
  • t4wst
  • More
    • Home
    • Contact Us
    • Satisfied Clients
    • Selected Projects
    • SAFETY
    • PROJECT DETAIL
    • TESTIMONIALS
    • t4wst
Tricter Rig
  • Home
  • Contact Us
  • Satisfied Clients
  • Selected Projects
  • SAFETY
  • PROJECT DETAIL
  • TESTIMONIALS
  • t4wst

project highlights

BPA Aberdeen Stormwater

Lockheed Martin Discharge Pipeline

Bob's Metal's Warehouse/Office

Installation of a new storm water treatment vault and upgrade the existing containment system to treat and store oil in the event of a spill.

Find out more

Bob's Metal's Warehouse/Office

Lockheed Martin Discharge Pipeline

Bob's Metal's Warehouse/Office

This project was comprised of storm water, sewer, water, gas, building footings and parkinglot upgrades.

Find out more

Lockheed Martin Discharge Pipeline

Lockheed Martin Discharge Pipeline

Lockheed Martin Discharge Pipeline

Design and construct a pipeline that discharges treated leachate generated at the CERCLA landfill into the City of the Dalles sanitary sewer collection and treatment system.

Find out more

BPA Alvey Washrack - Design Build

BPA Covington Storm Water Drainage Upgrade

Lockheed Martin Discharge Pipeline

Installation ofl a vehicle wash rack system at the BPA Alvey Maintenance Facility.

Find out more

BPA Covington Storm Water Drainage Upgrade

BPA Covington Storm Water Drainage Upgrade

BPA Covington Storm Water Drainage Upgrade

Upgrade the storm water treatment and containment system; constructing two onsite filteration basins.  Includes erosion and sediment control system.

Find out more

BPA Chemawa Washrack - Design Build

BPA Covington Storm Water Drainage Upgrade

BPA Covington Storm Water Drainage Upgrade

Construct a large industrial truck wash rack at the BPA Chemawa Substation Facility.  The equipment wash rack is a recirculated system with zero discharge.  

Find out more

PROJECT highlights

Bob's Metal's Storwater Upgrade

BPA Ovando Environmental Drainage Project

Bob's Metal's Storwater Upgrade

Installation of a new stormwater treatement system and upgrade the recycling facilities existing operating platform.

Find out more

BPA Albany Stormwater Upgrade

BPA Ovando Environmental Drainage Project

Bob's Metal's Storwater Upgrade

Installation of a secondary containment/stormwater treatement system for oil filled equipment at the Albany Substation.

Find out more

BPA Ovando Environmental Drainage Project

BPA Ovando Environmental Drainage Project

BPA Ovando Environmental Drainage Project

Installation of new secondary containment system to bring the facility into compliance with regulatory requirements.

Find out more

CCB#: (OR) 166717      (WA) TRICTRL945M7


ESB#8730 


"Whatever you do, work at it with all your heart, as if working for the Lord, not for men." Colossians 3:23


Copyright © 2017 Tricter Rig-All Rights Reserved.