Installation of a new storm water treatment vault and upgrade the existing containment system to treat and store oil in the event of a spill.
This project was comprised of storm water, sewer, water, gas, building footings and parkinglot upgrades.
Design and construct a pipeline that discharges treated leachate generated at the CERCLA landfill into the City of the Dalles sanitary sewer collection and treatment system.
Installation ofl a vehicle wash rack system at the BPA Alvey Maintenance Facility.
Upgrade the storm water treatment and containment system; constructing two onsite filteration basins. Includes erosion and sediment control system.
Construct a large industrial truck wash rack at the BPA Chemawa Substation Facility. The equipment wash rack is a recirculated system with zero discharge.
Installation of a new stormwater treatement system and upgrade the recycling facilities existing operating platform.
Installation of a secondary containment/stormwater treatement system for oil filled equipment at the Albany Substation.
Installation of new secondary containment system to bring the facility into compliance with regulatory requirements.
Future project
Future project
Future Project